Higher-capacity backup-power package for longer runtime requirements, cellular gateway loads, or additional protected network equipment. Runtime must be calculated and load-tested with the actual gateway, modem, power conversion, network equipment, battery age, and temperature — no fixed runtime is stated until validated for the deployment.